Corrections and clarifications

Our report on the effluent spill from the Flexsys site at Ruabon (ENDS Report 333, p 15 ) said that the incident "forced" the closure of a water abstraction intake on the river Dee. In fact, the incident did not reach the level of severity required for this under the Dee pollution plan; the abstraction was shut down purely as a precautionary measure.

Sorry you do not have access to this article. Please contact Customer Support at
or call 020 8267 8120