EA clarifies topsoil rules
Operators using up to 1,000 tonnes of waste-derived topsoil do not need an environmental permit, the Environment Agency has confirmed

Operators using up to 1,000 tonnes of waste-derived topsoil do not need an environmental permit, the Environment Agency has confirmed