Menu
Air Management

Council u-turns on cruise port power plan

An east London borough has signalled its intention to impose tougher air quality controls on a planned cruise liner terminal on the Thames, reversing its opposition to requiring the facility to supply power to ships docked there

Sorry you do not have access to this article. Please contact Customer Support at
report@ends.co.uk
or call 020 8267 8120

The ENDS Report - subscribe today